Skip to product information
WaveLine 10 ft S-Curve Display
$1,049.00
Complete package: this listing includes the display hardware and a custom-printed graphic package matching the selected configuration.
Included
- 10 ft s-curve aluminum frame
- Custom-printed stretch-fabric graphic matching the selected side option
- Nylon travel bag
Not included
- LED spotlights
- Counter
- Triangular shelf
- CA700 hard shipping case