Replacement graphic
WaveLine 20 ft S-Curve Replacement Graphic
Single-sided
Replacement printed graphic only. Display hardware is not included. Free standard shipping in the contiguous U.S.
Complete package: a portable 20 ft s-curve fabric backwall with your custom-printed graphic.
Aluminum tube frame. Dye-sublimated stretch fabric.
Setup: push-fit tube frame with zippered fabric graphic.
Free artwork review + digital proof included. Nothing goes to print until you approve it.
One-year warranty on hardware and graphics · Secure checkout
Check your show-date deadline before ordering.
THE DETAILS, WITHOUT THE GUESSWORK
These details describe the packed shipment. Check each case against your vehicle or airline limits.
Before arranging transport, check the packed dimensions and weight against your vehicle or carrier limits. Use the finder for a conservative order-and-artwork deadline. Tight dates, holidays and special-venue deliveries need written confirmation.
Replacement graphic
Single-sided
Replacement printed graphic only. Display hardware is not included. Free standard shipping in the contiguous U.S.
Replacement graphic
Double-sided
Replacement printed graphic only. Display hardware is not included. Free standard shipping in the contiguous U.S.
Free artwork review and a digital proof are included with every printed display. We check your file against the matched template, bleed and safe areas, image resolution, fonts and linked graphics, then send a proof for approval before production.
Start your design with the template for your selected display and printed sides.
Export settings for the selected product and the selected print option.
Use High Quality Print. Outline text and embed images in the PDF.
Aim for 72–125 ppi at the final printed size.
Prepare colors in CMYK. Recommended rich black is C20 M40 Y60 K100.
Hide template and specification layers before exporting.
Include the template name, project, and panel or version in each filename.
Include a separate JPG or screenshot labeled “proof” for content checking.
Take the selected print option, matched templates and file requirements with you.
Use the matched templates for artwork dimensions, bleed and safe areas. One template may be reused across several printed panels.
Find the setup guide for the frame and hardware. These instructions are separate from files used to design printed graphics.
One-year limited warranty on hardware and graphics, subject to the published warranty terms.